PLTS Sumenep 2

Project Overview
This project is photovoltaic land-based power plant located in Sumenep, East Java, Indonesia with capacity of 50 MWac. The expected date of Commercial Operational Date (COD) of the project is in 2027 and will be connected to the 150 kV grid system. The pre feasibility study of the project was completed by PLN Nusantara Power, Subholding of PLN, in 2023.
Project Specifications
This section outlines the project’s key technical identifiers, including its code, primary and sub-technology, program type, and classification as a transmission or generation project.
Project Code
PS-01-06-1124Technology
Utility scale solar PVSub Technology
Ground mountedProgram Type
Project X NusantaraTransmission/Generation
GenerationType of Project
OnGrid (connected)Project Scope
This section defines the scope of the project by detailing the grant information, geographic location, and associated grid infrastructure.
Project Location
This section provides geographic context for the project, including a distribution map, the designated province, and the specific project location.
Dedicated (province)
East JavaLocation of project
SumenepDevelopment
This section presents comprehensive information on the project’s development, including the overall scope and the current status of implementation.
Development Scope
This section covers E&S compliance, land acquisition, developer flexibility, existing permits, and the expected CoD year.
Expected Year of CoD
2027