Connectivity
Back to Project List
Structuring Project

PLTS Pemalang

PT PLN Nusantara Power
0 Financiers
0 Developers
22 August 2025 - 12:55
Project Image

Project Overview

This project is photovoltaic land-based power plant located in Pemalang, Central Java, Indonesia with capacity of 50 MWac. The expected date of Commercial Operational Date (COD) of the project is in 2028 and will be connected to the 150 kV grid system. The feasibility study of the project was completed by PLN Nusantara Power, Subholding of PLN, in 2022.

Project Specifications

This section outlines the project’s key technical identifiers, including its code, primary and sub-technology, program type, and classification as a transmission or generation project.

Project Code

PS-01-07-1124

Technology

Utility scale solar PV

Sub Technology

Ground mounted

Program Type

Project X Nusantara

Transmission/Generation

Generation

Type of Project

OnGrid (connected)

Project Scope

This section defines the scope of the project by detailing the grant information, geographic location, and associated grid infrastructure.

Project Location

This section provides geographic context for the project, including a distribution map, the designated province, and the specific project location.

Dedicated (province)

Central Java

Location of project

Pemalang

Development

This section presents comprehensive information on the project’s development, including the overall scope and the current status of implementation.

Development Scope

This section covers E&S compliance, land acquisition, developer flexibility, existing permits, and the expected CoD year.

Expected Year of CoD

2028
Please note that the information provided may be updated periodically by the project owner.